New construction updates - Bayliss 62'
by John Bayliss 3 Sep 2019 15:25 UTC
Work on the flybridge has been rolling right along on Bayliss 62'. Once the layout was finalized, build-out of the peninsula style console and starboard benchseat commenced. The brow door was also just constructed and hinged in place.
Down in the cockpit, the coverboards have been constructed over the course of the last month. The fishbox has been faired and construction of the tuna door is now underway.
Soon, the mechanical department will begin roughing-in fresh water lines and the electrical department will start on wire pulls.
Read more about Bayliss 62' at www.baylissboatworks.com/boats/gb4/