Please select your home edition
Edition
Maritimo 2023 S-Series LEADERBOARD

Introducing GameBoat #3: Tarheel

by John Bayliss 3 Jul 2018 03:32 UTC
GameBoat, the 62' Tarheel © Bayliss Boatworks

At the end of June, we flipped our third GameBoat, the 62' Tarheel.

Tarheel features the V.2 GameBoat layout - a healthy synergy of our first two GameBoats: the 60' Mama C and the 62' GameChanger. Bayliss Boatworks first demo boat, she will be fished heavily on the east coast tournament circuit and will eventually wind up in Costa Rica.

Exterior features include a variety of faux teak components, including a faux teak toe rail, transom and drip molding. She will have a sleek profile, hard top, and white windshield. Tarheel's flybridge will have the classic center console arrangement; the salon will be oriented around a center door, as well. In the galley, two peninsula cabinets will be used for refrigeration and storage.

The lower level will be comprised of a simple three stateroom/two-head layout, along with an easily accessible dayhead and tackle room, each situated just off the main companionway.

Systems will include two 20 kw Northern Lights generators, an FCI 1,800 gallon per day watermaker, and a Dometic Chilled Water A/C system (now standard on all Bayliss builds).

Specifications:

  • Length: 62'
  • Beam: 18' 2"
  • Draft: 4' 8"
  • Fuel: 1,850 gallons
  • Water: 300 gallons
  • Power: Twin MTU M96L 10V @ 1600 hp each
  • Stabilization: Seakeeper 9
  • Start Date: April 2018
  • Anticipated Delivery Date: Summer 2019

For more information on the GameBoat concept and interior layout options, click here.

Related Articles

Bayliss Boatworks new construction updates
Big news from Big Deal! Big news from Big Deal! Late last month, she successfully completed her first sea trial—a major milestone as she moves closer to delivery. Posted on 2 May
Bayliss Boatworks new construction updates
Big Deal is reaching significant milestones Big Deal is reaching significant milestones, starting with a major exterior update. Posted on 2 Apr
Bayliss Boatworks new construction updates
Big Deal was moved to the paint facility early last month to begin the full paint process Following our paint team's meticulous sanding of the hull, Big Deal was moved to our paint facility early last month to begin the full paint process. Posted on 2 Mar
Bayliss Boatworks new construction updates
Big Deal ready for its scheduled move to the paint bay in early March With the bridge console faired, our paint team is steadily progressing with priming and sanding, getting Big Deal ready for its scheduled move to the paint bay in early March. Posted on 1 Feb
Bayliss Boatworks new construction updates
Progress on Big Deal continues as the cockpit and mezzanine have been outfitted Progress on Big Deal continues as the cockpit and mezzanine, now fully primed, have been outfitted with a teak bullnose, teak decking, and teak mezzanine lids by our exterior carpentry team. Posted on 2 Jan
Bayliss Boatworks new construction updates
The paint team has started applying primer to the mezzanine on Big Deal With the mezzanine buildout complete on Big Deal, the paint team has started applying primer to the area. Posted on 3 Dec 2024
Max Bet Bayliss 64' on the water
The culmination of over 60,000 man-hours of dedicated craftsmanship The well-respected team behind Max Bet is no stranger to the Bayliss Boatworks family, having previously entrusted us with the repower of their 66' Spencer. Posted on 4 Nov 2024
Bayliss Boatworks new construction updates
Big Deal Bayliss 75', Tarheel Bayliss 64', Mama Seata Bayliss 76' With the glassing phase complete on Big Deal's mezzanine, our exterior team has applied Awlfair, and sanding is currently under way to ensure a smooth, polished finish before the primer is applied. Posted on 3 Nov 2024
Bayliss Boatworks new construction updates
Max Bet will reside dockside until her christening later this month Max Bet will reside dockside until her christening later this month, with our mechanical team testing and proving all systems. Posted on 1 Oct 2024
Bayliss Boatworks new construction updates
DekIt team joined us this month to install nonskid foam decking in the engine room After a successful first sea trial earlier this month, our interior carpentry team jumped back onto Max Bet to assist with the installation of granite countertops in the lower staterooms. Posted on 2 Sep 2024
Palm Beach Motor YachtsMaritimo 2023 S-Series FOOTER